- Total Area
- 16,900 m²
- Production Area
- 12,000 m²
- Annual Capacity
- 4,800 tons
- Employees
- 200+
Built for demanding
transformer applications.
Our core expertise lies in manufacturing high-specification and complex transformer tanks and clamping structures for securely holding the transformer active part, all produced to customer-specific designs.
Tank manufacturing includes project-specific piping, equipment integration and final adaptations, combining precision manufacturing, engineering know-how and rigorous quality standards to meet demanding transformer applications.
Small Power Transformer (SPT) Tanks
Manufactured to customer-specific designs for distribution and small power transformers, with individual tank weights below 7 tons and project-specific piping, equipment integration and connection details.
- Tank weights below 7 tons
Medium Power Transformer (MPT) Tanks
Manufactured to customer-specific designs for medium power transformers, with individual tank weights from 7 to 20 tons, supporting demanding specifications, complex configurations and integrated piping and equipment.
- Tank weights from 7 to 20 tons
Large Power Transformer (LPT) Tanks
Manufactured to customer-specific designs for large power transformers, with individual tank weights up to 35 tons, with a strong focus on high-specification, complex configurations and demanding project requirements.
- Tank weights up to 35 tons
Across all tank families
- Flat-wall structural steel plate construction
- S235, S355, S355NL & stainless steel options and more
- 100% leakage testing
- NDT inspection & testing
- Protective coating systems up to CX
- Water- and solvent-based coating systems
- Customer-specific manufacturing to approved designs
- Project-specific piping & equipment integration
- Precision-machined connection flanges
Active part clamping structures
- S355 & more structural steel grades
- S690QL & S960QL high-strength steel grades
- SS304, SS316 & more stainless steel grades
- High-speed deep-hole drilling for tie-rods
- Short-circuit mechanical force resistance
From raw steel to
finished tank.
Every stage is managed within our own facilities. Follow the sequence below as the tank takes shape, one operation at a time.
Verified,
not assumed.
Leakage & Pressure Testing
Finished tanks are tested for tightness before dispatch; an oil-tight structure is the product's first requirement, and it is confirmed by test, not by assumption.
NDT Inspection
Non-destructive testing is applied to welds where the specification requires it, and results are recorded with the product documentation.
Coating Verification
Dry film thickness is measured across the tank and adhesion is checked, confirming the coating has bonded to the prepared surface.
One network.
Three facilities.
All three facilities operate in Gebze, Kocaeli, Türkiye's industrial corridor, specialized in transformer flat wall tanks and clampings.
Headquarters & Factory
563. Sokak No: 13, GebzeKocaeli 41400, Türkiye
Factory
563. Sokak No: 17, GebzeKocaeli 41400, Türkiye
Factory
İstanbul Caddesi No: 71, GebzeKocaeli 41400, Türkiye
16,900 m² total area 12,000 m² production area 4,800 t/year capacity 200+ employees Combined totals
Ready for your
next project?
info@tsyenergy.com +90 (262) 658 2102 Gebze, Kocaeli, Türkiye